Tank Cladding

GMI was hired to assist an industrial customer who was having issues with their outdated tanks leaking from corrosive product. To assist in the cost involved with demo and fabrication of a new tank, the customer and GMI came up with a plan to Clad the tank with 304ss sheets to assist with corrosion resistance. The 30’ diameter tank that was roughly 42’ tall was Clad from the bottom to the roof line. The floor was clad first and tested with PT and Vac Box testing to ensure complete weld soundness. The walls were broken into a grid that was stopped at each rivet line. The walls were clad with sheets and the rivets were capped with custom bent and rolled pieces. The entire tank was NDE tested and then put through a hydro to verify no leaks were present.